Search

Meetings, decisions, questions and answers, and the text inside every project document.

Show

122 results for “parking”.

  1. Question

    How many parking spaces will there be?

    What changes can be expected on the campus/site?

    The site design assumed about 450 parking spaces. After additional coordination with District stakeholders, the current parking count target is 477. Details on the breakdown of the 477 spaces are available here .

  2. Document · PDF

    Community Forum #4 5/11/26 (PDF)

    Monday, May 11, 2026

    Existing 4 Stories to remain • Estimated duration of 54 months • 56 Modular Classrooms required • Parking : Existing parking lots to remain, renovated for accessibility compliance only • Fields : Edgerly fields (2) renovated in place, two practice fields

    Presentation slides for Community Forum #4, May 11, 2026

  3. Document · PDF

    Updated PSR Design Options (Shared on 4/27/26) (PDF)

    Monday, April 27, 2026

    Existing 4 Stories to remain • Estimated duration of 54 months • 56 Modular Classrooms required • Parking : Existing parking lots to remain, renovated for accessibility compliance only • Fields : Edgerly fields (2) renovated in place, two practice fields

    Document for Building Committee Meeting, Apr 27, 2026

  4. Document · PDF

    SBC Presentation 4/27/26 (PDF)

    Monday, April 27, 2026

    Existing 4 Stories to remain • Estimated duration of 54 months • 56 Modular Classrooms required • Parking : Existing parking lots to remain, renovated for accessibility compliance only • Fields : Edgerly fields (2) renovated in place, two practice fields

    Presentation slides for Building Committee Meeting, Apr 27, 2026

  5. Document · PDF

    Abutters Meeting #2 5/13/26 (PDF)

    Wednesday, May 13, 2026

    Existing 4 Stories to remain • Estimated duration of 54 months • 56 Modular Classrooms required • Parking : Existing parking lots to remain, renovated for accessibility compliance only • Fields : Edgerly fields (2) renovated in place, two practice fields

    Presentation slides for Abutters Meeting #2, May 13, 2026

  6. Document · PDF

    SBC Presentation 5/20/26 (PDF)

    Wednesday, May 20, 2026

    Restriction Alternative) New Building Footprint Existing Building Footprint 9 Summary: • Addition/renovation (On the Existing Footprint, on the Parking Lot to the west and a portion of Edgerly Field to the north) which proposes

    Presentation slides for Building Committee Meeting, May 20, 2026

  7. Document · PDF

    Parking Memo & Plan (PDF)

    Tuesday, August 25, 2026

    Lord Project Number: 25100 From: Laura Swan Date: 8/25/2026 Project Name: Medford High School RE: Parking Program-DRAFT Distribution: This memorandum is intended to describe our best understanding of the existing parking utilized

    Document for Building Committee Meeting, Aug 25, 2026

  8. Document · PDF

    Final Evaluation of Alternatives (PDF)

    Thursday, June 25, 2026

    Building Location Existing Footprint Existing Footprint Existing Footprint & Fields Existing Footprint & Fields Existing Footprint & Fields Parking Lot & Existing Footprint Parking Lot & Existing Footprint Modulars Required

  9. Document · PDF

    Evaluation of Existing Conditions (PDF)

    Thursday, June 25, 2026

    other site improvements vary significantly between the six PSR Alternatives; A.1, B.1.2, C2.2, C.3.4, D.1.1, and D.2.1. Parking options being considered include surface parking, construction of a 4-story parking garage, or field/stadium over below

  10. Document · PDF

    SBC Presentation 2/11/26 (PDF)

    Wednesday, February 11, 2026

    subcontractor expenses (not CM expenses). For this PDP level estimate these categories are: Renovation, Addition/New Construction, Sitework, Parking, Pool Scope, Hazmat Removal and Demolition (See rows 1-10) Construction Cost The cost of construction which

    Presentation slides for Building Committee Meeting, Feb 11, 2026

  11. Document · PDF

    Building Committee Meeting, February 11, 2026 — pDP Comparative Cost Analysis (PDF)

    Wednesday, February 11, 2026

    subcontractor expenses (not CM expenses). For this PDP level estimate these categories are: Renovation, Addition/New, Sitework, Parking, Pool Scope, Hazmat Removal and Demolition (See rows 1-11) Construction Cost The cost of construction which Includes

    Document for Building Committee Meeting, Feb 11, 2026

  12. Document · PDF

    Building Committee Meeting, March 23, 2026 — six Design Options Chosen (PDF)

    Monday, March 23, 2026

    Existing 4 Stories to remain • Estimated duration of 54 months • 56 Modular Classrooms required • Parking : Existing parking lots to remain, renovated for accessibility compliance only • Fields : Edgerly fields (2) renovated in place, two practice fields

    Document for Building Committee Meeting, Mar 23, 2026; Document for Community Forum #3, Apr 15, 2026

  13. Document · PDF

    Community Forum #3 4/15/26 (PDF)

    Wednesday, April 15, 2026

    Existing 4 Stories to remain • Estimated duration of 54 months • 56 Modular Classrooms required • Parking : Existing parking lots to remain, renovated for accessibility compliance only • Fields : Edgerly fields (2) renovated in place, two practice fields

    Presentation slides for Community Forum #3, Apr 15, 2026

  14. Document · PDF

    Final 6 PSR Design Options Presentation (PDF)

    Monday, June 1, 2026

    Educational Program • Existing 4 Stories to remain • Estimated duration of 60 months • 56 Modular Classrooms required • Parking : Existing parking lots to remain, renovated for accessibility compliance only • Fields : Maintains existing field inventory - Edgerly fields

    Meeting notes for Building Committee Meeting, Jun 1, 2026

  15. Document · PDF

    Community Forum #5 6/3/26 (PDF)

    Wednesday, June 3, 2026

    Educational Program • Existing 4 Stories to remain • Estimated duration of 60 months • 56 Modular Classrooms required • Parking : Existing parking lots to remain, renovated for accessibility compliance only • Fields : Maintains existing field inventory - Edgerly fields

    Presentation slides for Community Forum #5, Jun 3, 2026

  16. Document · PDF

    SBC Presentation 3/23/26 (PDF)

    Monday, March 23, 2026

    located so all students will access these spaces. So students do not feel singled out or 'special'. " • Parking congestion • Traffic flow • Bathroom privacy/safety • Pick-up/drop-off logistics. "Make a path for cars that goes completely

    Presentation slides for Building Committee Meeting, Mar 23, 2026

  17. Document · PDF

    SBC Presentation 6/10/26 (PDF)

    Wednesday, June 10, 2026

    folding into the high school project." D1.1 – ( 22) VOTES "D.1.1 NP — choosing this because I like the parking in the middle, making fields and building equally accessible, a new pool and gym ensure

    Presentation slides for Building Committee Meeting, Jun 10, 2026

  18. Document · PDF

    2026 10 01 Sustanability & Systems AT Meeting 07 notes (PDF)

    Thursday, October 1, 2026

    Officer Sarah Michelman, Medford Resident, Sustainable Design Consultant at The Green Engineer Nicole Morell, SBC Member Jessica Parks, Medford Resident, MIT Energy Efficiency Project Manager Brenda Pike, City of Medford Climate Policy Planner Luke Preisner

    Minutes for Sustainability & MEP Systems Advisory Meeting, Oct 1, 2026

  19. Document · PDF

    Site, Safety & Security Advisory Meeting, 2026-10-01: Presentation slides (PDF)

    Thursday, October 1, 2026

    Meeting #4 Agenda • Welcome & Introductions • Advisory Team Recommendation Development ❑ Parking Program ❑ Updated Site Layout ❑ Edgerly Track & Field ❑ Pedestrian Experience: ECC Breezeway ❑ Call for Assistance/ AED • Next Steps

    Presentation slides for Site, Safety & Security Advisory Meeting, Oct 1, 2026

  20. Document · PDF

    Evaluation Criteria Matrix (PDF)

    Thursday, March 19, 2026

    Addition Retain and Renovate Gym, Pool, and Wing E while constructing a New Addition on Parking Lot Retain and Renovate Gym, Pool and Wing E while constructing a New Addition in the center

    Document for Building Committee Meeting, Mar 17, 2026

  21. Document · PDF

    Evaluation Criteria Matrix (updated 3/19/26) (PDF)

    Thursday, March 19, 2026

    Addition Retain and Renovate Gym, Pool, and Wing E while constructing a New Addition on Parking Lot Retain and Renovate Gym, Pool and Wing E while constructing a New Addition in the center

    Document for Building Committee Meeting, Mar 17, 2026

  22. Document · PDF

    SBC Presentation 10/6/26 (PDF)

    Tuesday, October 6, 2026

    Approach VI. Review Project Adjacencies & Related Efficiencies for remaining project categories VII. Review Project Alternates for Parking & Athletic Fields VIII. Consider Previously Tabled Space Efficiency Proposals IX. Adjournment

    Presentation slides for Building Committee Meeting, Oct 6, 2026

  23. Document · PDF

    Community Forum #2, March 5, 2026 — community workshop follow-up input (March 16, 2026) (PDF)

    Thursday, March 5, 2026

    Architect Kate Tooke Landscape Architect SMMA Agency Matt Gulino Project Manager LeftField Berit Schurke Landscape Designer Rosemary Park Ed Planner Emily Ehlers HVAC Engineer Laura Swan Civil Engineer Jen Carlson Project Director Jamay Li Architectural

    Document for Community Forum #2, Mar 5, 2026

  24. Document · PDF

    Sustainability & MEP Systems Advisory Presentation 10/1/26 (PDF)

    Thursday, October 1, 2026

    Sustainability and MEP Systems – SD Preliminary Solar PV System Assessment Roof Solar Photovoltaic (PV) System Parking Solar Photovoltaic (PV) System Low Ballasted System High Canopy System Long Span Canopy System Parking Space Cover System Solar

    Presentation slides for Sustainability & MEP Systems Advisory Meeting, Oct 1, 2026

  25. Document · PDF

    Site, Safety & Security Advisory Meeting, 2026-10-01: Minutes (PDF)

    Thursday, October 1, 2026

    Civil Engineer Matt Rice, Principal-in-Charge, Architect Laura Swan, Civil Engineer Erik Vangsness, Landscape Architect Rosemary Park , Architect, Ed Planner Jamay Li, Architect Kate Tooke, Landscape Architect, Agency Kazia Rodrigo, Landscape Designer , Agency Berit

    Minutes for Site, Safety & Security Advisory Meeting, Oct 1, 2026

  26. Document · PDF

    Initial PDP Design Options (Voted by SBC on 3/23/26) (PDF)

    Monday, March 23, 2026

    project cost of $825,209,435 million. • Option B.2.1 : Addition/renovation (On the Existing Footprint and on the Parking Lot to the south) which proposes 186,280 sf of new construction as 3 Stories, in place

  27. Document · PDF

    Revised Pricing Matrix With Options C.2.2A & C.3.4A (PDF)

    Tuesday, June 9, 2026

    Sitework (base including all at-grade surface parking and fields

    Document for Building Committee Meeting, Jun 1, 2026

  28. Document · PDF

    2026.09.23 Sustainability & Systems Advisory Team Meeting #6 (PDF)

    Wednesday, September 23, 2026

    Officer Sarah Michelman, Medford Resident, Sustainable Design Consultant at The Green Engineer Nicole Morell, SBC Member Jessica Parks, Medford Resident, MIT Energy Efficiency Project Manager Brenda Pike, City of Medford Climate Policy Planner Luke Preisner

    Minutes for Sustainability & MEP Systems Advisory Meeting, Sep 23, 2026

  29. Document · PDF

    SBC Minutes 4/27/26 (PDF)

    Monday, April 27, 2026

    resolved that the next round of cost estimating will provide cost estimates breakdown as follows: ■ Parking: a) Base estimate will include surface grade parking and note the number of allowable spaces and note

    Minutes for Building Committee Meeting, Apr 27, 2026

  30. Document · PDF

    SBC Agenda 4/27/26 (PDF)

    Monday, April 27, 2026

    resolved that the next round of cost estimating will provide cost estimates breakdown as follows: 1. Parking: a) Base estimate will include surface grade parking and note the number of allowable spaces and note

    Agenda for Building Committee Meeting, Apr 27, 2026

  31. Document · PDF

    SBC Presentation 8/25/26 (PDF)

    Tuesday, August 25, 2026

    panels) $2,683,800 $3,274,236 PV2 - Provide Canopy Structures only for PV Panels over Parking, Drive Aisles and CTE Yards for NetZero (assume PPA for all PV Panels

    Presentation slides for Building Committee Meeting, Aug 25, 2026

  32. Document · PDF

    PSR Alternates (PDF)

    Friday, July 17, 2026

    owns the panels) 2,683,800 $ 3,274,236 $ PV2 - Purchase Additional Canopy Mounted PV Panels over Parking, Drive Aisles and CTE Yards for NetZero (assume City/District owns the panels

  33. Document · PDF

    SBC Presentation 12/22/25 (PDF)

    Monday, December 22, 2025

    Accessibility Exterior - Majority of accessible parking spaces have slope issues and/or non-compliant signage - Accessible routes have several issues of non- compliance - Several stairs lack compliant handrails - Majority of public entrances have barriers: • Some have

    Presentation slides for Building Committee Meeting – Design Team Update, Dec 22, 2025

  34. Document · PDF

    Sustainability & MEP Systems Avisory Presentation 9/23/26 (PDF)

    Wednesday, September 23, 2026

    Baseline) - - - $77,290,000 $173,009,000 Option 1 Ground Source Heat Pump - GSHP 9 acres Main Parking Lower Field Areas Temporary HVAC System – 3.5 yrs $93,417,000 $164,744,000 Option 2 Hybrid

    Presentation slides for Sustainability & MEP Systems Advisory Meeting, Sep 23, 2026

  35. Document · PDF

    SBC Presentation 1/14/26 (PDF)

    Wednesday, January 14, 2026

    Alternatives for High Level Cost Estimating / Rules of Thumb – Landscape options: color key – Parking is consistent at 425 spaces for all options in different configurations. Preschool Play space and CTE yards are consistent

    Presentation slides for Building Committee Meeting, Jan 14, 2026

  36. Document · PDF

    Site Safety & Security Advisory Group Notes 3/11/26 (PDF)

    Wednesday, March 11, 2026

    High School Project Number: 25100 RE: Advisory Team - Site, Safety & Security Meeting Date: 03/11/2026 Prepared by: Rosemary Park Meeting Number: 3 Distribution: Attendees Owner SMMA & Consultants Leftfield Nicole Branley, Resident Chief Jack Buckley, Chief

    Meeting notes for Site & Security Advisory Meeting, Mar 11, 2026

  37. Document · PDF

    Design Alternatives (Slide 14 – Updated 3.19.26) (PDF)

    Thursday, March 19, 2026

    Alternatives for High Level Cost Estimating / Rules of Thumb – Landscape options: color key – Parking is consistent at 425 spaces for all options in different configurations. Preschool Play space and CTE yards are consistent

    Document for Building Committee Meeting, Mar 17, 2026

  38. Document · PDF

    SBC Minutes 8/25/26 (PDF)

    Tuesday, August 25, 2026

    estimated total project cost of $768,577,410. VII. Determine Baseline Size for Auditorium VIII. Design Updates & Parking Program The project team did a study on parking on the current site, which comes

    Minutes for Building Committee Meeting, Aug 25, 2026

  39. Document · PDF

    SBC Presentation 2/23/26 (PDF)

    Monday, February 23, 2026

    fixed % of Roof Surface Incl in base bid $0 PV2 Purchase Additional Canopy Mounted PV Panels over Parking & Roadways $32,619,060 $32,619,060 PV3 Canopy Structure only for PV Panels over Parking & Roadways

    Presentation slides for Building Committee Meeting, Feb 23, 2026

  40. Document · PDF

    SMMA Designer Submission (PDF)

    Wednesday, August 27, 2025

    core of our process. The educational programming team brings the combined expertise of SMMA’s Rosemary Park (planning), New Vista Design’s David Stephen (visioning), and Dr. Karen Maguire (CTE leadership). Sustainable design thinking will