161 results for “cost”.

  1. Decision

    $25.8 million off the estimated cost — 20,276 sq ft trimmed

    Tuesday, August 25, 2026

    … lding is now 588,516 sq ft, with an estimated total project cost of $768.6 million.

  2. Decision

    $2.9 million off the estimated cost — 2,700 sq ft trimmed

    Thursday, September 10, 2026

    … lding is now 585,816 sq ft, with an estimated total project cost of $765.7 million.

  3. Decision

    $16.9 million off the estimated cost — 15,530 sq ft trimmed

    Tuesday, September 22, 2026

    … lding is now 570,286 sq ft, with an estimated total project cost of $748.8 million.

  4. Decision

    $48.9 million off the estimated cost — 2,409 sq ft trimmed

    Tuesday, October 6, 2026

    … lding is now 567,877 sq ft, with an estimated total project cost of $699.9 million.

  5. Question

    How much will the project cost, and how much will Medford pay?

    Project Funding and Cost

    … Schematic Design Phase. The MSBA reimbursement for eligible costs will be voted on at the April 2027 MSBA Board of Directors Meeting. As of the October 6, 2026 meeting, the total project cost is estimated at $699,862,410 …

  6. Question

    Why does Medford's project cost more than recent high schools in Waltham and Brockton?

    Project Funding and Cost

    The MSBA has seen dramatic cost increases in school construction in recent years due to market factors and material costs. When comparing our project to neighboring communities, the project start and completion timeline …

  7. Question

    Why do different School Districts get Different Reimbursement Rates for Eligible Costs?

    Project Funding and Cost

    … on/Re-use of Existing Facilities (up to 5 percentage points)

  8. Document · PDF

    SBC Minutes 4/27/26 (PDF)

    Monday, April 27, 2026

    Offered by Jenny Graham and Dr. Suzanne Galusi: Be it resolved that the next round of cost estimating will provide cost estimates breakdown as follows: ■ Parking: a) Base estimate will include surface grade parking

    Minutes for Building Committee Meeting, Apr 27, 2026

  9. Document · PDF

    SBC Agenda 4/27/26 (PDF)

    Monday, April 27, 2026

    Offered by Jenny Graham and Dr. Suzanne Galusi: Be it resolved that the next round of cost estimating will provide cost estimates breakdown as follows: 1. Parking: a) Base estimate will include surface grade parking

    Agenda for Building Committee Meeting, Apr 27, 2026

  10. Document · PDF

    SBC Presentation 6/1/26 (PDF)

    Monday, June 1, 2026

    Meeting Minutes ➢ Project Updates & Follow-ups ➢ Medford Update on Capital Projects and Preliminary Estimate of Project Costs Impact ➢ Review PSR Cost Estimate for C2.2A & C3.4A ➢ Project Timeline June 2026 – June 2027 ➢ Updated Evaluation Criteria Matrix

    Presentation slides for Building Committee Meeting, Jun 1, 2026

  11. Document · PDF

    SBC Presentation 3/23/26 (PDF)

    Monday, March 23, 2026

    Operations (4%) Trailheads & Connection to the Fells (4%) Community Gathering Facilities (3%) Construction Timeline (2%) Keeping Construction Costs Low 416 Votes Community Health Center, Counseling/ Youth Center Pest control during demolitions Healthy Indoor building, Indoor

    Presentation slides for Building Committee Meeting, Mar 23, 2026

  12. Document · PDF

    Sustainability & MEP Systems Avisory Presentation 9/23/26 (PDF)

    Wednesday, September 23, 2026

    Agenda ➢ Sustainability Givens Overview ➢ Net Zero Energy & Minimizing Cost of Ownership • Preliminary Life Cycle Cost Analysis (LCCA) Information ➢ Preliminary Solar PV Assessment ➢ Red List Free Materials ➢ Embodied Carbon & Mass Timber ➢ Water Efficiency & Stewardship ➢ Next Steps

    Presentation slides for Sustainability & MEP Systems Advisory Meeting, Sep 23, 2026

  13. Document · PDF

    2026.09.23 Sustainability & Systems Advisory Team Meeting #6 (PDF)

    Wednesday, September 23, 2026

    Action Discussion 06.01 Record Meeting #6 Agenda Welcome & introductions • Sustainability Givens Overview • Net Zero Energy & Minimizing Cost of Ownership Preliminary Life Cycle Cost Analysis (LCCA) Information ○ • Preliminary Solar PV Assessment • Red List Free Materials • Embodied

    Minutes for Sustainability & MEP Systems Advisory Meeting, Sep 23, 2026

  14. Document · PDF

    SBC Presentation 2/11/26 (PDF)

    Wednesday, February 11, 2026

    Amendment #1 • Summary of Reactions to Alternatives • PDP Submission Status - due 2/25 • Educational Plan • Space Summary Review • Cost Information for January 14, 2026 Alternatives • Introduction of Evaluation Criteria • Review of Cost Information for January

    Presentation slides for Building Committee Meeting, Feb 11, 2026

  15. Document · PDF

    Community Forum #2, March 5, 2026 — community workshop follow-up input (March 16, 2026) (PDF)

    Thursday, March 5, 2026

    Code Upgrade Option Alt A.1 Cost: ~$437M New Building Footprint Existing Building Footprint Summary: • Base Repair at the existing Medford High School facility • Estimated total project cost

    Document for Community Forum #2, Mar 5, 2026

  16. Document · PDF

    Building Committee Meeting, February 11, 2026 — pDP Comparative Cost Analysis (PDF)

    Wednesday, February 11, 2026

    Cost Estimates The following slides are an excerpt from the February 11, 2026 Meeting of the Medford Comprehensive High School Building Committee Meeting. Visit https://medfordhsproject.com/event/medford-high-school-building-co mmittee-meeting-february-11-2026/for full meeting

    Document for Building Committee Meeting, Feb 11, 2026

  17. Document · PDF

    Community Forum #5 6/3/26 (PDF)

    Wednesday, June 3, 2026

    High School Community Forum #5 06/03/2026 06/08/2026 rev1 – updated with Winthrop St. Perspectives and Estimated District Share Costs

    Presentation slides for Community Forum #5, Jun 3, 2026

  18. Document · PDF

    Sustainability & MEP Systems Advisory Meeting, March 10, 2026 — presentation slides (PDF)

    Tuesday, March 10, 2026

    Meeting #3 Agenda • Welcome & Introductions • Advisory Team Recommendation Development • Life Cycle Cost Analysis (LCCA) Overview • Next Steps

    Presentation slides for Sustainability & MEP Systems Advisory Meeting, Mar 10, 2026

  19. Document · PDF

    Appendices (PDF)

    Thursday, June 25, 2026

    Meetings D. LEEDv5 Scorecard E. MHS Educational Plan – (clean version) F. MHS Educational Plan – (track changes) G. Cost Information i. PSR Cost Estimate (AM Fogarty) ii. Comparative Cost Analysis iii. Preliminary Design Pricing Table

  20. Document · PDF

    SBC Presentation 2/23/26 (PDF)

    Monday, February 23, 2026

    Agenda ➢ Roll call ➢ Approval of Meeting Minutes • February 11 Full Committee Meeting ➢ Cost Estimate Updates ➢ Vote to approve submission of Preliminary Design Program Report ➢ Evaluation Criteria Review ➢ Adjournment

    Presentation slides for Building Committee Meeting, Feb 23, 2026

  21. Document · PDF

    LeftField OPM Submission (PDF)

    Friday, May 2, 2025

    Study/Schematic Design Phase Basic Services Total: $550,000 Our fee for Basic Services above excludes any Independent Cost Estimates, to be included in Owner’s Budget. Should the Feasibility Study duration extend beyond the anticipated

  22. Document · PDF

    Sustainability & MEP Systems Advisory Group Presentation 1/15/26 (PDF)

    Thursday, January 15, 2026

    Takeaways from Meeting #1 • LEEDv5 Preliminary Overview • Climate Resiliency • Embodied Carbon • Healthfulness and Environmental Literacy • Life Cycle Cost Analysis Overview • Next Steps

    Presentation slides for Sustainability & MEP Systems Advisory Meeting, Jan 15, 2026

  23. Document · PDF

    District Response to PDP Comments (PDF)

    Tuesday, May 19, 2026

    local law, prior to bidding. The MSBA shall not be responsible for any legal fees or costs of any kind that may be incurred by a city, town or regional school district in relation

    Document for Building Committee Meeting, May 20, 2026

  24. Document · PDF

    2026 10 01 Sustanability & Systems AT Meeting 07 notes (PDF)

    Thursday, October 1, 2026

    Phase 1 and 2 avoiding the need for temporary heating and cooling. • AtWHP System is most cost-effective overall and in the overall 50-year life cycle, reduction in total project cost (from PSR budget

    Minutes for Sustainability & MEP Systems Advisory Meeting, Oct 1, 2026

  25. Document · PDF

    SBC Presentation 6/10/26 (PDF)

    Wednesday, June 10, 2026

    Evaluation Criteria Matrix 9 Note : The evaluations of the High School-Only C.2.2A-HS Alternative assume that first cost and operational costs will still be incurred by the District and City when the programs currently

    Presentation slides for Building Committee Meeting, Jun 10, 2026

  26. Document · PDF

    Final Evaluation of Alternatives (PDF)

    Thursday, June 25, 2026

    Preferred Schematic Report / Medford High School 3.3.3 Final Evaluation of Alternatives A. Summary of Alternatives (including cost and schedule) Multiple construction alternatives for a grade 9-12 high school with enrollment of 1,395 students

  27. Document · PDF

    Initial PDP Design Options (Voted by SBC on 3/23/26) (PDF)

    Monday, March 23, 2026

    High School facility designed for 1,395 students in grades 9-12; with an estimated total project cost of $437,180,506 million. • Option B.1.1 : Addition/renovation (On the Existing Footprint) which proposes

  28. Document · PDF

    SBC Presentation 1/14/26 (PDF)

    Wednesday, January 14, 2026

    Option o Add/Reno Options o New Building Options 9) Interactive Input Session to Provide Feedback on Initial Cost Alternatives 10) Questions Regarding Alternatives o MCSHBC Members o Public Comment o Next Steps 11) Guidance

    Presentation slides for Building Committee Meeting, Jan 14, 2026

  29. Document · PDF

    Design Alternatives (Slide 14 – Updated 3.19.26) (PDF)

    Thursday, March 19, 2026

    Option o Add/Reno Options o New Building Options 9) Interactive Input Session to Provide Feedback on Initial Cost Alternatives 10) Questions Regarding Alternatives o MCSHBC Members o Public Comment o Next Steps 11) Guidance

    Document for Building Committee Meeting, Mar 17, 2026

  30. Document · PDF

    Document A PSR Comments from MSBA (PDF)

    October 2026

    local law, prior to bidding. The MSBA shall not be responsible for any legal fees or costs of any kind that may be incurred by a city, town or regional school district in relation

  31. Document · PDF

    Introduction (PDF)

    Thursday, June 25, 2026

    additional option was requested to facilitate a conversation with the community about the additional space and project costs associated with the non-high school related programs. The Project Team added this high school only alternative

  32. Document · PDF

    MEP Systems Advisory Group Notes 7/21/26 (PDF)

    Tuesday, July 21, 2026

    Action Discussion 05.01 Record Meeting #5 Agenda Welcome & introductions • LEED Version Review and Confirmation • Preliminary Life Cycle Cost Analysis (LCCA) Information • Next Steps • 05.02 SMMA LEED Version Review and Confirmation Motion voted and approved

    Minutes for Building CMR Pre-Qualification Sub Committee Meeting, Jul 14, 2026; Minutes for Sustainability & MEP Systems Advisory Meeting, Jul 21, 2026

  33. Document · PDF

    SBC Presentation 10/6/26 (PDF)

    Tuesday, October 6, 2026

    Chiller [ASHRAE System #7] GSHP = Ground Source Heat Pump AtWHP = Air Source Heat Pump LCCA = Life Cycle Cost Analysis Main School Building HVAC Systems LCCA Advisory Workgroup Recommendation per 10.1.2026 meeting

    Presentation slides for Building Committee Meeting, Oct 6, 2026

  34. Document · PDF

    Statement of Interest (PDF)

    Thursday, April 13, 2023

    pipes has worsened with multiple major failures resulting in the flooding and forced closures of classrooms with costly and expedited repair projects again a near constant phenomenon. During the current school year alone, multiple vocational

  35. Document · PDF

    OPM RFS (PDF)

    existing School, a renovation and addition of the existing School and/or new construction. The estimated total project costs of an approved potential Project may range from $200,000,000 to $600,000,000 depending upon

  36. Document · PDF

    SBC Presentation 5/20/26 (PDF)

    Wednesday, May 20, 2026

    Approval of April 27 MCHSBC Minutes ➢ Deed Restriction & Next Steps ➢ MSBA PDP Comments & Team Response Summary ➢ PSR Cost Estimates Review ➢ Adjournment

    Presentation slides for Building Committee Meeting, May 20, 2026

  37. Document · PDF

    SBC Presentation 4/15/26 (PDF)

    Wednesday, April 15, 2026

    Approval of Meeting Minutes • March 23 MCHSBC Meeting ➢ Approval of Invoices ➢ Review of MSBA Eligible vs. Ineligible Costs ➢ Adjournment

    Presentation slides for Building Committee Meeting, Apr 15, 2026

  38. Document · PDF

    Sustainability & MEP Systems Advisory Presentation 10/1/26 (PDF)

    Thursday, October 1, 2026

    Agenda ➢ Vote to Recommend HVAC System ➢ Net Zero Energy & Minimizing Cost of Ownership ➢ Preliminary Solar PV Assessment ➢ Red List Free Materials - deferred to a future meeting ➢ Embodied Carbon & Mass Timber - deferred to a future meeting

    Presentation slides for Sustainability & MEP Systems Advisory Meeting, Oct 1, 2026

  39. Document · PDF

    PDP Comments from the MSBA (PDF)

    Tuesday, May 5, 2026

    natatorium (pool). The submitted options include these programs and their associated spaces. The resulting estimated total project costs are $825 to $850 million for addition/renovation and $836 to $894 million for new construction. Based

    Document for Building Committee Meeting, May 20, 2026

  40. Document · PDF

    Revised Pricing Matrix With Options C.2.2A & C.3.4A (PDF)

    Tuesday, June 9, 2026

    Medford HS - PSR Alternatives Cost Matrix          Medford Comprehensive High School Preferred Schematic Report - Comparative Cost Analysis A Code Upgrade to building and site # Alternate Programs A.1.1 B.1.2 C.2.2A C.3.4A D.1.1 D.1.1 - HS Only D.1.1

    Document for Building Committee Meeting, Jun 1, 2026

  41. Document · PDF

    Preferred Option C.2.2.A Cost Matrix (PDF)

    Tuesday, August 25, 2026

    Medford HS - Preferred Option Cost Martix Medford Comprehensive High School Preferred Schematic Report - Preferred Option Cost Matrix 8/25/2026 6:00 pm # Alternate Programs C.2.2A 1 Renovation 53,821,790 $ 2 Addition/New Construction

  42. Document · PDF

    SBC Presentation 8/25/26 (PDF)

    Tuesday, August 25, 2026

    Goals (next Slide) 7.21.26 - Medford Sustainability Advisory Team o Medford School Committee Update o PSR Life Cycle Cost Analysis update* (previously presented to SBC) o Preliminary PSR Solar PV update* o Preliminary Embodied Carbon Update

    Presentation slides for Building Committee Meeting, Aug 25, 2026

  43. Document · PDF

    City of Medford Tax Impact (Debt Exclusion) Presentation (PDF)

    Monday, June 1, 2026

    come. As project planning continues, affordability remains a critical consideration. This presentation provides information on project costs, tax impacts, and the factors residents should understand in order to provide feedback to the School Building Committee

    Document for Building Committee Meeting, Jun 1, 2026

  44. Document · PDF

    SBC Presentation 3/17/26 (PDF)

    Tuesday, March 17, 2026

    narrow options to 3-5 • 4/27 MCHSBC meeting to review MSBA PDP comments & GSF confirmation prior to cost estimating effort • 5/20 MCHSBC meeting to review cost estimates • 5/27 MCHSBC meeting to review costs for options

    Presentation slides for Building Committee Meeting, Mar 17, 2026

  45. Document · PDF

    Final 6 PSR Design Options Presentation (PDF)

    Monday, June 1, 2026

    Review of PSR Cost Alternates – Total Project Cost Projections 14 Alternative A.1 3 B.1.2 C.2.2A C.3.4A D.1.1 D.1.1NP HS Only

    Meeting notes for Building Committee Meeting, Jun 1, 2026

  46. Document · PDF

    Community Forum #3 4/15/26 (PDF)

    Wednesday, April 15, 2026

    MSBA that documents the project scope, budget, schedule, and potential MSBA participation for a proposed project – Project Cost – Finalized project budget that must be maintained through end of project

    Presentation slides for Community Forum #3, Apr 15, 2026

  47. Document · PDF

    Community Forum #6: Eco-Charrette (PDF)

    Thursday, September 17, 2026

    School Committee Motion • LEEDv4 (Silver minimum) • Net Zero Energy • Healthy Materials (1% MSBA) • Water Stewardship (30% reduction) • Cost of Ownership (LCCA

    Presentation slides for Community Meeting #6 – Eco-Charrette, Sep 17, 2026

  48. Document · PDF

    Sustainability & MEP Systems Advisory Group Minutes 1/15/26 (PDF)

    Thursday, January 15, 2026

    Takeaways from Meeting #1 LEEDv5 Preliminary Overview ○ Climate Resilency ○ Embodied Carbon ○ Healthfulness, Environmental Quality Literacy ○ Life Cycle Cost Analysis - Cost Effectiveness Overview ○ • Next Steps • 02.02 Record Overview of Advisory Team Process & Milestones Four Advisory Teams

    Minutes for Sustainability & MEP Systems Advisory Meeting, Jan 15, 2026

  49. Document · PDF

    OPM monthly report – August 2026 (PDF)

    August 2026

    project is currently on target to hit the following milestone dates: - February 6, 2026 – PDP Comparative Cost Estimate Reconciliation - End of February 2026 - Preliminary Design Program (PDP) Submission due to MSBA for staff review - June

  50. Document · PDF

    OPM monthly report – July 2026 (PDF)

    July 2026

    project is currently on target to hit the following milestone dates: - February 6, 2026 – PDP Comparative Cost Estimate Reconciliation - End of February 2026 - Preliminary Design Program (PDP) Submission due to MSBA for staff review - June

  51. Document · PDF

    Local Actions and Approvals (PDF)

    Thursday, June 25, 2026

    Galusi 13/0/2 - Motion Tabled III. Review and Finalize Alternatives Evaluation Matrix Motion to Apply a cost multiplier of ten to the cost evaluation criteria to only the alternatives that fall within the $200-$600 range

  52. Document · PDF

    SBC Presentation 4/27/26 (PDF)

    Monday, April 27, 2026

    Building Committee and ongoing review of the Evaluation Criteria Matrix • Design Team detailed study and review Updated Costs for the Design Options are not yet available because: • Space reductions are being voted upon this evening

    Presentation slides for Building Committee Meeting, Apr 27, 2026

  53. Document · PDF

    Updated PSR Design Options (Shared on 4/27/26) (PDF)

    Monday, April 27, 2026

    Building Committee and ongoing review of the Evaluation Criteria Matrix • Design Team detailed study and review Updated Costs for the Design Options are not yet available because: • Space reductions are being voted upon this evening

    Document for Building Committee Meeting, Apr 27, 2026

  54. Document · PDF

    Abutters Meeting #2 5/13/26 (PDF)

    Wednesday, May 13, 2026

    Statement of Interest (SOI) and outlined in the District's Educational Program • Estimated total project cost of $437,180,506 • Existing 4 Stories to remain • Estimated duration of 54 months • 56 Modular Classrooms required • Parking

    Presentation slides for Abutters Meeting #2, May 13, 2026

  55. Document · PDF

    Community Forum #4 5/11/26 (PDF)

    Monday, May 11, 2026

    Statement of Interest (SOI) and outlined in the District's Educational Program • Estimated total project cost of $437,180,506 • Existing 4 Stories to remain • Estimated duration of 54 months • 56 Modular Classrooms required • Parking

    Presentation slides for Community Forum #4, May 11, 2026

  56. Document · PDF

    OPM monthly report – February 2026 (PDF)

    Saturday, February 28, 2026

    reconciliation meeting was held on February 6, 2026. The PDP comparative cost analysis was provided to the SBC at their meeting on February 11, 2026. The SBC voted to approve the 29 options and their

  57. Document · PDF

    SBC Minutes 6/1/26 (PDF)

    Monday, June 1, 2026

    being considered for the project. IV. Medford Update on Capital Projects and Preliminary Estimate of Project Cost Impact Luke Preisner: Thanked city for their work on the presentation, asked city if it was possible

    Minutes for Building Committee Meeting, Jun 1, 2026

  58. Document · PDF

    Communications & Community Engagement Plan (draft of 2/11/26) (PDF)

    Wednesday, February 11, 2026

    that point people to the project website for information and to the mailing list signup. ● Citywide mailer - cost estimating in progress. Mailer will point people to the project website for information and to the mailing

    Document for Building Committee Communications Sub Committee Meeting, Jan 28, 2026

  59. Document · PDF

    Communications Plan (draft, February 11, 2026) (PDF)

    Wednesday, February 11, 2026

    that point people to the project website for information and to the mailing list signup. ● Citywide mailer - cost estimating in progress. Mailer will point people to the project website for information and to the mailing

    Document for Building Committee Communications Sub Committee Meeting, Jan 28, 2026

  60. Document · PDF

    SBC Presentation 2/25/26 (PDF)

    Wednesday, February 25, 2026

    public construction projects in Massachusetts: construction management at-risk (CM at Risk) for building projects estimated to cost $5 million or more and design-build for public works projects estimated to cost $5 million

    Presentation slides for Building Committee Meeting (Virtual), Feb 25, 2026